2. Project planning includes details to the best of your ability of the next two weeks. This includes but does not limit load out plan, stockpile plan, flagger, travel time, etc. This is not a concrete plan, but tentative. If the plan changes, project planning will be updated.
3. Please include the areas of your project that need high level attention. FOR EXAMPLE - Behind on rail, Behind on OTM, Rail car spotting, Truck loading, row access, fire danger, crossing availability, lack of railroad support, labor on vacation, equipment in the shop or breakdown, etc.
4. List the challenges that will prevent you from making this plan successful. For example - back-to-back crossings, Surf gang, form B, Limited stockpile locations, soft ground, slick rail, grade. ETC. Please be as detailed as possible.